Please order (by 1pm) 2 days before the
required delivery date for guaranteed 1st class delivery.
ONLY THE TWO ITEMS LISTED ABOVE SHOULD HAVE A PRIORITY DESIGNATOR OF 01-08 OR USE A
REQUIRED DELIVERY DATE OF 999, E, N, OR 555.
1, 2011, application date and March 2012
required delivery date.
(The mode operator is the battalion assigned to move the equipment.) The TMR manager then monitored the daily status for completion to ensure delivery of the cargo by the
required delivery date (RDD) or no later than 9 days after the RDD.
First Rate's solution, called Travel Money Online, will also allow easyJet's customers to select their
required delivery date, with orders received before 3.00 p.m.
There is such a staggering volume of effort required to provide facilities for all of the Iraqi security elements that very often the
required delivery date has passed and there are already Iraqi units that need the facilities.
Functionals explained that the capability had been requested correctly but, if an item missed a ready-to-load date at the origin or an available-to-load date at the APOE, the original line in the TPFDD was deleted, and a new line with a new
required delivery date was established.
Once the program was established and approved by the Department of Defense, the Defense Security Cooperation Agency HA/MA office facilitated the transportation by matching the size of the shipment with the mode of transport, within the
required delivery date.
(8) The rated order must also contain a
required delivery date or dates.
(2) A
required delivery date (or dates) (the words "immediately" or "as soon as possible" are not delivery dates);
More than two-thirds always or frequently specify a
required delivery date. Having parts, components, and equipment on-hand ready for use when needed is as important in plant engineering and maintenance as it is in any just-in-time production system.